Evaluation of sampling plans for in-service inspection of steam generator tubes /

Saved in:
Bibliographic Details
Main Author: Bowen, W. M.
Corporate Authors: U.S. Nuclear Regulatory Commission. Office of Nuclear Regulatory Research. Division of Engineering, Pacific Northwest Laboratory
Other Authors: Heasler, P. G., White, R. B.
Format: Government Document Book
Language:English
Published: Washington, D.C. : Division of Engineering, Office of Nuclear Regulatory Research, U.S. Nuclear Regulatory Commission, 1989-
Subjects:

MARC

LEADER 00000nam a2200000 a 4500
001 57b37663-926e-4e5a-b0ca-350ed4141456
005 20240719000000.0
008 891107m19899999dcua bbt f000 0 eng d
035 |a (OCoLC)30834659  |z 20609175 
037 |a 052-021-00092-8 (v. 1)  |b GPO 
040 |d GPO  |d DLC  |d MvI 
040 |d MvI 
049 |a MPZU 
074 |a 1051-H-11 (MF) 
086 0 |a Y 3.N 88:25/5161/v.1- 
100 1 |a Bowen, W. M. 
245 1 0 |a Evaluation of sampling plans for in-service inspection of steam generator tubes /  |c prepared by W.M. Bowen, P.G. Heasler, R.B. White. 
260 |a Washington, D.C. :  |b Division of Engineering, Office of Nuclear Regulatory Research, U.S. Nuclear Regulatory Commission,  |c 1989- 
300 |a v. :  |b ill. ;  |c 28 cm. 
500 |a "Pacific Northwest Laboratory." 
500 |a Distributed to depository libraries in microfiche. 
500 |a Vol. 1 no longer available for sale by the Supt. of Docs. 
500 |a "Date published: April 1989"--Vol. 1. 
500 |a "NUREG/CR-5161." 
500 |a "PNL-6462." 
504 |a Includes bibliographical references. 
505 1 |a v. 1. Modeling of eddy-current reliability data, analytical evaluations, and initial Monte Carlo simulations. 
536 |b B2097. 
650 0 |a Steam-boiler inspection. 
650 0 |a Nuclear power plants  |x Equipment and supplies  |x Inspection. 
700 1 |a Heasler, P. G. 
700 1 |a White, R. B. 
710 2 |a U.S. Nuclear Regulatory Commission.  |b Office of Nuclear Regulatory Research.  |b Division of Engineering. 
710 2 |a Pacific Northwest Laboratory. 
999 1 0 |i 57b37663-926e-4e5a-b0ca-350ed4141456  |l 4001913  |s US-MNMHCL  |m evaluation_of_sampling_plans_for_in_service_inspection_of_steam_genera_____1989_______divisa________________________________________bowen__w__m________________________y_3_n_88_25_5161_v_1_p 
999 1 1 |l 4001913  |s ISIL:US-MNMHCL  |i Hennepin County Library  |t BKS  |a mcgd afig-r-  |c Y 3.N 88:25/5161/v.1-  |b mq6321067  |x nc  |y 6321067  |p UNLOANABLE