|
|
|
|
LEADER |
00000nam a2200000 a 4500 |
001 |
57b37663-926e-4e5a-b0ca-350ed4141456 |
005 |
20240719000000.0 |
008 |
891107m19899999dcua bbt f000 0 eng d |
035 |
|
|
|a (OCoLC)30834659
|z 20609175
|
037 |
|
|
|a 052-021-00092-8 (v. 1)
|b GPO
|
040 |
|
|
|d GPO
|d DLC
|d MvI
|
040 |
|
|
|d MvI
|
049 |
|
|
|a MPZU
|
074 |
|
|
|a 1051-H-11 (MF)
|
086 |
0 |
|
|a Y 3.N 88:25/5161/v.1-
|
100 |
1 |
|
|a Bowen, W. M.
|
245 |
1 |
0 |
|a Evaluation of sampling plans for in-service inspection of steam generator tubes /
|c prepared by W.M. Bowen, P.G. Heasler, R.B. White.
|
260 |
|
|
|a Washington, D.C. :
|b Division of Engineering, Office of Nuclear Regulatory Research, U.S. Nuclear Regulatory Commission,
|c 1989-
|
300 |
|
|
|a v. :
|b ill. ;
|c 28 cm.
|
500 |
|
|
|a "Pacific Northwest Laboratory."
|
500 |
|
|
|a Distributed to depository libraries in microfiche.
|
500 |
|
|
|a Vol. 1 no longer available for sale by the Supt. of Docs.
|
500 |
|
|
|a "Date published: April 1989"--Vol. 1.
|
500 |
|
|
|a "NUREG/CR-5161."
|
500 |
|
|
|a "PNL-6462."
|
504 |
|
|
|a Includes bibliographical references.
|
505 |
1 |
|
|a v. 1. Modeling of eddy-current reliability data, analytical evaluations, and initial Monte Carlo simulations.
|
536 |
|
|
|b B2097.
|
650 |
|
0 |
|a Steam-boiler inspection.
|
650 |
|
0 |
|a Nuclear power plants
|x Equipment and supplies
|x Inspection.
|
700 |
1 |
|
|a Heasler, P. G.
|
700 |
1 |
|
|a White, R. B.
|
710 |
2 |
|
|a U.S. Nuclear Regulatory Commission.
|b Office of Nuclear Regulatory Research.
|b Division of Engineering.
|
710 |
2 |
|
|a Pacific Northwest Laboratory.
|
999 |
1 |
0 |
|i 57b37663-926e-4e5a-b0ca-350ed4141456
|l 4001913
|s US-MNMHCL
|m evaluation_of_sampling_plans_for_in_service_inspection_of_steam_genera_____1989_______divisa________________________________________bowen__w__m________________________y_3_n_88_25_5161_v_1_p
|
999 |
1 |
1 |
|l 4001913
|s ISIL:US-MNMHCL
|i Hennepin County Library
|t BKS
|a mcgd afig-r-
|c Y 3.N 88:25/5161/v.1-
|b mq6321067
|x nc
|y 6321067
|p UNLOANABLE
|