Showing 1 - 20 results of 28 for search 'HDR Engineering', query time: 0.07s
Refine Results
-
1
Handbook of public water systems
New York : Wiley, 2001“…HDR Engineering…”
2nd ed.
Call Number: Loading…
Located: Loading…Format: Book
//IF NOT LOGGED IN - FORCE LOGIN ?>
//ELSE THEY ARE LOGGED IN PROCEED WITH THE OPEN URL CODE:?> -
2
East Central Solid Waste Commission solid waste management system analysis.
[Minneapolis, Minn.] : [St. Paul, Minn.] : [HDR Engineering] ; [E & G Consulting], 1993“…HDR Engineering…”
Call Number: Loading…
Located: Loading…Format: Book
//IF NOT LOGGED IN - FORCE LOGIN ?>
//ELSE THEY ARE LOGGED IN PROCEED WITH THE OPEN URL CODE:?> -
3
Sustainable highway evaluation
[Saint Paul, MN : Minnesota Department of Transportation, 2011Call Number: Loading…
Located: Loading…Format: Book
//IF NOT LOGGED IN - FORCE LOGIN ?>
//ELSE THEY ARE LOGGED IN PROCEED WITH THE OPEN URL CODE:?> -
4
UPM/Blandin Paper Thunderhawk Project, Grand Rapids, Minnesota : final environmental impact statement
St. Paul, MN : Minnesota Dept. of Natural Resources, 2006Call Number: Loading…
Located: Loading…Format: Book
//IF NOT LOGGED IN - FORCE LOGIN ?>
//ELSE THEY ARE LOGGED IN PROCEED WITH THE OPEN URL CODE:?> -
5
UPM/Blandin Paper Thunderhawk Project, Grand Rapids, Minnesota draft environmental impact statement
St. Paul, MN : Minnesota Dept. of Natural Resources, 2006Call Number: Loading…
Located: Loading…Format: Book
//IF NOT LOGGED IN - FORCE LOGIN ?>
//ELSE THEY ARE LOGGED IN PROCEED WITH THE OPEN URL CODE:?> -
6
Curved steel bridge research project. Interim report I, Synthesis by Zureick, A.
McLean, Va. : [Springfield, VA : Federal Highway Administration ; Available through the National Technical Information Service, 1994Call Number: Loading…
Located: Loading…Format: Government Document Book
//IF NOT LOGGED IN - FORCE LOGIN ?>
//ELSE THEY ARE LOGGED IN PROCEED WITH THE OPEN URL CODE:?> -
7
DM&E 404 permit application site photographs
[South Dakota] : [HDR, Inc.], 2000Call Number: Loading…
Located: Loading…Format: Image
//IF NOT LOGGED IN - FORCE LOGIN ?>
//ELSE THEY ARE LOGGED IN PROCEED WITH THE OPEN URL CODE:?> -
8
MnDOT Bridge No. 5557 : historical condition assessment bridge management plan by Pratt, Daniel R.
Minneapolis, Minn. : HDR Engineering, 2004Call Number: Loading…
Located: Loading…Format: Book
//IF NOT LOGGED IN - FORCE LOGIN ?>
//ELSE THEY ARE LOGGED IN PROCEED WITH THE OPEN URL CODE:?> -
9
Influence of pavement on traffic noise : statistical pass-by measurements of traffic on several interstate pavements by Dick, Elliot B.
St. Paul, Minn. : Minnesota Department of Transportation, Research Services Section, 2010Call Number: Loading…
Located: Loading…Format: Book
//IF NOT LOGGED IN - FORCE LOGIN ?>
//ELSE THEY ARE LOGGED IN PROCEED WITH THE OPEN URL CODE:?> -
10
Phase I archaeological survey for the proposed TH 169 / CSAH 4 grade-separated interchange project, city of Zimmerman, Sherburne County, Minnesota by Justin, Michael A.
Minneapolis, Minn. : HDR Engineering, Inc., 2008Call Number: Loading…
Located: Loading…Format: Book
//IF NOT LOGGED IN - FORCE LOGIN ?>
//ELSE THEY ARE LOGGED IN PROCEED WITH THE OPEN URL CODE:?> -
11
Sinusoidal rumble strips safety evaluation by Storm, Richard
St. Paul, Minn. : Minnesota Department of Transportation, Office of Research & Innovation, 2023Call Number: Loading…
Located: Loading…Format: Book
//IF NOT LOGGED IN - FORCE LOGIN ?>
//ELSE THEY ARE LOGGED IN PROCEED WITH THE OPEN URL CODE:?> -
12
Phase I archaeological investigation for the proposed S.P. 14-611-20 (Bridge 90856 replacement) CSAH 11, Clay County, Minnesota by Justin, Michael A.
Minneapolis, Minn. : HDR Engineering, Inc., 2008Call Number: Loading…
Located: Loading…Format: Book
//IF NOT LOGGED IN - FORCE LOGIN ?>
//ELSE THEY ARE LOGGED IN PROCEED WITH THE OPEN URL CODE:?> -
13
Phase I archaeological survey for the proposed Butterfield Lake Trail, S.P. 83-090-03, Watonwan County, Minnesota by Justin, Michael A.
Minneapolis, Minn. : HDR Engineering, Inc., 2008Call Number: Loading…
Located: Loading…Format: Book
//IF NOT LOGGED IN - FORCE LOGIN ?>
//ELSE THEY ARE LOGGED IN PROCEED WITH THE OPEN URL CODE:?> -
14
Phase I archaeological survey for the proposed TH 169/TH 10 grade-separated interchange project, city of Elk River, Sherburne County, Minnesota by Justin, Michael A.
Minneapolis, Minn. : HDR Engineering, Inc., 2008Call Number: Loading…
Located: Loading…Format: Book
//IF NOT LOGGED IN - FORCE LOGIN ?>
//ELSE THEY ARE LOGGED IN PROCEED WITH THE OPEN URL CODE:?> -
15
Phase I archaeological survey and inventory for the proposed S.P. 2513-70 (Bridge 6773 replacement) Trunk Highway 61, Goodhue County, Minnesota by Justin, Michael A.
[Saint Paul, Minn.] : Minnesota Dept. of Transportation, 2009Call Number: Loading…
Located: Loading…Format: Book
//IF NOT LOGGED IN - FORCE LOGIN ?>
//ELSE THEY ARE LOGGED IN PROCEED WITH THE OPEN URL CODE:?> -
16
Phase I archaeological investigation for the proposed replacement of Bridge 4677 on TH 65 over Prairie Creek, Koochiching County, Minnesota by Justin, Michael A.
[Saint Paul, Minn.] : Minnesota Dept. of Transportation, 2011Call Number: Loading…
Located: Loading…Format: Book
//IF NOT LOGGED IN - FORCE LOGIN ?>
//ELSE THEY ARE LOGGED IN PROCEED WITH THE OPEN URL CODE:?> -
17
Phase I archaeological survey for the proposed TH 12 road realignment, expansion and trail, Wright County, Minnesota
Minneapolis, Minn. : HDR Engineering, Inc., 2007Call Number: Loading…
Located: Loading…Format: Book
//IF NOT LOGGED IN - FORCE LOGIN ?>
//ELSE THEY ARE LOGGED IN PROCEED WITH THE OPEN URL CODE:?> -
18
Innovative bridge construction for Minnesota local roads by Dorgan, Dan
[Saint Paul, Minn.] : Minnesota Dept. of Transportation, Office of Policy Analysis, Research & Innovation, Research Services Section, 2012“…HDR Engineering…”
Call Number: Loading…
Located: Loading…Format: Book
//IF NOT LOGGED IN - FORCE LOGIN ?>
//ELSE THEY ARE LOGGED IN PROCEED WITH THE OPEN URL CODE:?> -
19
Draft environmental impact statement for Pine Island Bog horticultural peat development
St. Paul, Minn. : Minnesota Dept. of Natural Resources, 2001Call Number: Loading…
Located: Loading…Format: Book
//IF NOT LOGGED IN - FORCE LOGIN ?>
//ELSE THEY ARE LOGGED IN PROCEED WITH THE OPEN URL CODE:?> -
20
Final environmental impact statement : Pine Island Bog horticultural peat development
St. Paul, Minn. : Minnesota Dept. of Natural Resources, 2001Call Number: Loading…
Located: Loading…Format: Book
//IF NOT LOGGED IN - FORCE LOGIN ?>
//ELSE THEY ARE LOGGED IN PROCEED WITH THE OPEN URL CODE:?>
Search Tools:
Related Subjects
Environmental aspects
Design and construction
Environmental impact statements
Evaluation
Water
Bicycle commuting
Bicycle trails
Bridges
Crash modification factors
Economic conditions
Forest management
Paper mills
Peat bogs
Peat industry
Purification
Safety measures
Traffic safety
Walking
Acoustic emission
Bayes' theorem
Before and after studies
Bridge engineering
Bridge failures
Crash modification factors,
Curves in engineering
Drinking water
Guard fences
Highway bridges
Iron and steel bridges
Marine accidents